By-Pass Valve
During drilling operation, when a well kick takes place and bit bore is blocked, the by-pass valve can be opened to allow fluid circulation and well killing. Before drilling in a gas formation, the By-Pass valve shall be located near or on the bit.
Related products
GS (I) Type Casing Brusher is one of the indispensable auxiliary tools for well completion, testing and downhole operation. Its main purpose is to remove the residual attachments after the scraping operation of downhole casing inner wall scraper and protect the cleanness of casing inner wall, so as to facilitate the normal operation of all drilling tools. It is usually used with casing scraper.GS (I) Type Casing Brusher is not suitable for drilling operation.
GX-X Type Non-rotating Casing Scraper is one of the indispensable auxiliary tools for well completion, testing and downhole operation. The main purpose of the scraper is to remove cement, sand, residual bullets, scratches, paraffin, burrs and other attachments from the inner wall of the downhole casing, and protect the inner wall of the casing, so as to facilitate the normal operation of all drilling tools. Type B non rotating scraper is not suitable for drilling operation.
TIANHE Reverse Circulation Junk Basket (RCJB) is designed to remove all types of small junk objects from the well hole. The tool’s main feature is that it eliminates the possibility of pulling a wet string during fishing operation with its reverse drainage design. The RCJB can also be used as a fish magnet when fitted with a magnet insert, while maintaining its reverse fluid circulation feature.
When well kick take place and pump pressure is too high or blocked, the following steps can be taken to open the By-Pass valve :
● Discharge Kelly and drop in a steel ball (or a nylon ball) which is carried by tool;
● Connect with Kelly;
● Put ball into retainer by pump circulation;
● When fluid is closed, the shear pin can be sheared off by adding 0.5~1.5MPa higher pump pressure than original pump pressure;
● After pin is sheared, the seal sleeve move down to open the discharge hole and pump pressure come to drop down , then normal circulation and well killing operation can be started.
When ordering please specify:
● O.D. of body;
● Connection;
● Pump pressure required to shear off pin (per customer requirement)











